Columbia Basin Fish and Wildlife Program Columbia Basin Fish and Wildlife Program
SOW Report
Contract 74314 REL 154: 2006-003-00 EXP DESERT WILDLIFE AREA O&M
Project Number:
Title:
Desert Wildlife Mitigation
Stage:
Implementation
Area:
Province Subbasin %
Columbia Plateau Crab 100.00%
Contract Number:
74314 REL 154
Contract Title:
2006-003-00 EXP DESERT WILDLIFE AREA O&M
Contract Continuation:
Previous: Next:
74314 REL 122: 2006-003-00 EXP DESERT WILDLIFE AREA O&M
Contract Status:
Closed
Contract Description:
The Desert Wildlife Mitigation Project is comprised of 6 (TD-1,2,3,4,5,6) wetland enhancement projects designed to benefit waterfowl, shorebirds and other wetland obligate species.  The projects are funded in part by the BPA, and are all located on the Desert Wildlife Area Unit of the Columbia Basin Wildlife Area.  BPA funds were provided for initial development work at the TD-1 and TD-2 projects.  BPA funds are currently provided for annual operation and maintenance activities performed at all six wetland projects.  

The TD-1 project is an intensively managed flow-through system of 9 restored wetland basins that are seasonally inundated by diverting water from the adjacent Frenchman Hills Wasteway.  Enhancements completed during initial development include:  installation of 8 water control structures; diking; channeling; shallow excavation and contouring; strategic armoring of the dikes to deter burrowing mammals; and planting of disturbed areas.  In 2017 a second expansion enhancement phase was completed.  The expansion development utilized outside funds, though permitting and work was coordinated with the BPA which allowed operation and maintenance activities to be incorporated into the TD-1 project.   Enhancements completed during the expansion development include:  installation of 2 water control structures; diking; channeling; shallow excavation and contouring; island development; and planting of disturbed areas.  Presently, annual operation and maintenance activities at TD-1 include:  coordinate water use with BOR and Quincy Irrigation District; implement moist soil management strategies; inspect and repair enhancements; establish desirable vegetation; control undesirable vegetation; operate and maintain water control structures; monitor and report annual waterfowl use; and BPA contract administration and reporting.

The TD-2 project is a managed system of 19 restored wetland basins that are passively inundated by seasonal fluctuations of the adjacent Winchester Wasteway.  Enhancements completed during the initial development include:  shallow excavation and contouring of 19 late-succession stage wetlands; construct isolation dikes to eliminate surface water connections and prevent fish entering the project from adjacent managed lakes; strategic armoring of dikes to deter burrowing mammals; and planting of disturbed areas. Annual operation and maintenance activities at TD-2 include:  inspect and repair enhancements; establish desirable vegetation; control undesirable vegetation; maintain duck nest tubes; and BPA contract administration and reporting.

The TD-3, TD-4, TD-5 and TD-6 projects were identified and included in the original project proposal as areas that would provide improved benefits for migratory and residential wetland associate species through strategic management techniques. TD-3 and TD-5 are influenced by the Frenchman Hills Wasteway, while TD-4 and TD-6 by the Winchester Wasteway. No formal enhancements have occurred on these projects to date.  Annual operation and maintenance activities on these sites have consisted of monitoring and controlling undesirable vegetation.        
Account Type(s):
Expense
Contract Start Date:
02/01/2022
Contract End Date:
01/31/2023
Current Contract Value:
$156,857
Expenditures:
$156,857

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Full Name Organization Write Permission Contact Role Email Work Phone
James Cole Washington Department of Fish and Wildlife (WDFW) Yes Contract Manager james.cole@dfw.wa.gov (509) 765-6641
Sean Dougherty Washington Department of Fish and Wildlife (WDFW) Yes Technical Contact sean.dougherty@dfw.wa.gov (509) 754-4624
Israel Duran Bonneville Power Administration Yes Env. Compliance Lead induran@bpa.gov (503) 230-3967
Chad Eidson Washington Department of Fish and Wildlife (WDFW) No Supervisor chad.eidson@dfw.wa.gov (509) 765-6641
Richard Finger Washington Department of Fish and Wildlife (WDFW) No Supervisor richard.finger@dfw.wa.gov (509) 754-4624
Michael Garrity Washington Department of Fish and Wildlife (WDFW) No Administrative Contact michael.garrity@dfw.wa.gov (360) 810-0877
Bonnie Greeninger Bonneville Power Administration Yes Contracting Officer begreeninger@bpa.gov (360) 601-5500
Janice Jackson Washington Department of Fish and Wildlife (WDFW) No Administrative Contact janice.jackson@dfw.wa.gov (360) 902-2444
Chattan McPherson Washington Department of Fish and Wildlife (WDFW) No Technical Contact Chattan.Mcpherson@dfw.wa.gov (509) 765-6641
Kurt Merg Washington Department of Fish and Wildlife (WDFW) No Administrative Contact kurt.merg@dfw.wa.gov (509) 288-7067
John Skidmore Bonneville Power Administration Yes F&W Approver jtskidmore@bpa.gov (503) 230-5494
Ryan Walker Washington Department of Fish and Wildlife (WDFW) No Technical Contact ryan.walker@dfw.wa.gov (509) 765-6641
Virgil Watts III Bonneville Power Administration Yes COR vlwatts@bpa.gov (503) 230-4625


Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
BPA Administrative duties B: 119. BPA Administrative Requirements 01/31/2023 01/31/2023
Environmental Compliance C: 165. Complete environmental compliance documentation 01/31/2023 01/31/2023
TD-1 cells tilled D: 181. Till cells at TD1 10/31/2022 10/31/2022
Seed 20 acres of moist soil vegetation at TD-1 project site E: 47. Moist soil seeding in TD-1 10/31/2022 10/31/2022
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2, TD-4, TD-6 F: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 01/31/2023 01/31/2023
Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1, TD-3, TD-5 G: 198. Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 01/31/2023 01/31/2023
Armor dikes at the TD-1 site H: 186. Inspect and repair water control structures and dikes at TD-1 site 01/31/2023 01/31/2023
Armor dikes at the TD-2 site I: 186. Inspect and repair dikes at TD-2 site 01/31/2023 01/31/2023
Seed and plant plugs into disturbed soil at TD-1 J: 186. Seed and plant plugs into disturbed soil at TD-1 site 01/31/2023 01/31/2023
Seed and plant plugs into disturbed soil at TD-2 K: 186. Seed and plant plugs into disturbed soil at TD-2 site 01/31/2023 01/31/2023
Seasonally inundate and dewater the wetland cells at TD-1 (Oct-May) L: 186. Operate water control structures at TD-1 01/31/2023 01/31/2023
Numbers and species of waterfowl using TD-1 and TD-2 waters through the spring, fall and winter M: 157. Fall and winter waterfowl counts 01/31/2023
Attach 2021 Annual Progress Report in Pisces N: 132. Submit Progress Report for the period Feb 2021 to Jan 2022 09/30/2022 09/30/2022

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Wildlife
  • 2 instances of WE 198 Maintain Vegetation
  • 5 instances of WE 186 Operate and Maintain Habitat/Passage/Structure
  • 1 instance of WE 47 Plant Vegetation
  • 1 instance of WE 181 Create, Restore, and/or Enhance Wetland
  • 1 instance of WE 157 Collect/Generate/Validate Field and Lab Data

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 185 Periodic Status Reports for BPA
B 119 BPA Administrative Requirements
C 165 Complete environmental compliance documentation
D 181 Till cells at TD1 02/01/2022
E 47 Moist soil seeding in TD-1 02/01/2022
F 198 Monitor and maintain desirable vegetation, control undesirable vegetation at TD-2 02/01/2022
G 198 Monitor and maintain desirable vegetation, control undesirable vegetation at TD-1 02/01/2022
H 186 Inspect and repair water control structures and dikes at TD-1 site 02/01/2022
I 186 Inspect and repair dikes at TD-2 site 02/01/2022
J 186 Seed and plant plugs into disturbed soil at TD-1 site 02/01/2022
K 186 Seed and plant plugs into disturbed soil at TD-2 site 02/01/2022
L 186 Operate water control structures at TD-1 02/01/2022
M 157 Fall and winter waterfowl counts 02/01/2022
N 132 Submit Progress Report for the period Feb 2021 to Jan 2022